I’m installing an engineered wood floor in a second floor bedroom. Currently has a plywood subfloor in fairly decent shape. However there are some voids and gaps in the subfloor. What product should be used to fill these areas? Would ceramic tile adhesive work? Do the gaps between plywood sheets (maybe 1/8″ gap) need to be taped and filled?
Thanks?